J) Any existing earthenware/clay pipes, asbestos cement pipes and corrugated iron culverts shall be looked upon as outside of their practical working lifestyle and shall be replaced at the expense of the developer irrespective of existing situation. d) Precise location of the present pipelines shall be needed. Pot holing may http://sleeping33120.post-blogs.com/18494786/little-known-facts-about-auckland-building-inspections