In case the piles are Forged and able to be pushed ahead of the installation phase is due, it may increase the speed of labor. The height of the ground beam normally relies on the expected degree of the ground flooring slab. I have noticed a lot of configurations. https://euripidesv742nuc8.wikisona.com/user