Make sure the substrate is nicely sealed and that all hungry places are dealt with before continuing to setup the system. In the event the overcoating time frame to the primer is exceeded, the surface area need to be lightly abraded and vacuumed prior to additional coats are utilized. Mainly https://mcgepoxycoatings.com/why-decorative-quartz-screed-works-wonders-for-hospitality-flooring/