The very first park features a capacity of 200 MW whilst Sandrini II features a ability of a hundred MW. The whole expense of both of those tasks were not disclosed even so, through design, about 200 workers were being used. The assignments are envisioned to discover a handful of https://californiasolarpanels.home.blog/2024/11/26/4-things-to-consider-before-hiring-commercial-solar-installers/