The 1st park has a ability of two hundred MW even though Sandrini II includes a capacity of one hundred MW. The total cost of equally projects weren't disclosed however, for the duration of building, in excess of 200 personnel were being utilized. The assignments are anticipated to check out https://bestsolarcompaniesinfresno.blogspot.com/