At first, the Jai Hind metro station was prepared to get elevated. Nevertheless, the AAI objected the elevated stretch up towards the airport might pose a risk to aircraft, And so the route was further reworked and also the station was shifted underground, 150 m from your Airport terminal building. https://martinn887kbs7.wikijm.com/user